




it was a long 3 day marathon, but the new studio is finally finished! thanks to jonathan for co-building it with me, and thanks to kotaro and everyone else who helped out with the finishing touches. the pictures above show the process, starting with the truck we rented and finishing with the last coat of urethane drying. the 4 step design was decided on since the garage had originally had an 8 degree downward slope.


0 comments:
Post a Comment